Skip to content

chore(deps): update dependency score_process to v2#626

Closed
eclipse-score-bot wants to merge 1 commit into
mainfrom
renovate/score_process-2.x
Closed

chore(deps): update dependency score_process to v2#626
eclipse-score-bot wants to merge 1 commit into
mainfrom
renovate/score_process-2.x

Conversation

@eclipse-score-bot

@eclipse-score-bot eclipse-score-bot commented Jun 30, 2026

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Type Update Change
score_process bazel_dep major 1.6.02.0.1

  • If you want to rebase/retry this PR, check this box

This PR was generated by #infrastructure automation. Contact us if you have any questions or feedback.

@github-actions

github-actions Bot commented Jun 30, 2026

Copy link
Copy Markdown

License Check Results

🚀 The license check job ran with the Bazel command:

bazel run --lockfile_mode=error //src:license-check

Status: ⚠️ Needs Review

Click to expand output
[License Check Output]
Extracting Bazel installation...
Starting local Bazel server (8.6.0) and connecting to it...
INFO: Invocation ID: f5c1b74b-85e2-494e-80eb-c40f61274bbc
Computing main repo mapping: 
Loading: 
Loading: 0 packages loaded
Loading: 0 packages loaded
Loading: 0 packages loaded
    currently loading: src
WARNING: Target pattern parsing failed.
ERROR: Skipping '//src:license-check': no such target '//src:license-check': target 'license-check' not declared in package 'src' defined by /home/runner/work/docs-as-code/docs-as-code/src/BUILD
ERROR: no such target '//src:license-check': target 'license-check' not declared in package 'src' defined by /home/runner/work/docs-as-code/docs-as-code/src/BUILD
INFO: Elapsed time: 6.128s
INFO: 0 processes.
ERROR: Build did NOT complete successfully
ERROR: Build failed. Not running target

@a-zw

a-zw commented Jun 30, 2026

Copy link
Copy Markdown
Contributor

Alternative update PR: #627

@eclipse-score-bot eclipse-score-bot force-pushed the renovate/score_process-2.x branch from f622958 to b60627f Compare July 3, 2026 09:03
@MaximilianSoerenPollak

Copy link
Copy Markdown
Contributor

Will be updated by #627

@eclipse-score-bot

Copy link
Copy Markdown
Contributor Author

Renovate Ignore Notification

Because you closed this PR without merging, Renovate will ignore this update. You will not get PRs for any future 2.x releases. But if you manually upgrade to 2.x then Renovate will re-enable minor and patch updates automatically.

If you accidentally closed this PR, or if you changed your mind: rename this PR to get a fresh replacement PR.

@eclipse-score-bot eclipse-score-bot deleted the renovate/score_process-2.x branch July 3, 2026 10:54
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

Development

Successfully merging this pull request may close these issues.

3 participants