Skip to content

Latest commit

 

History

1 Commit

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 

Repository files navigation

NI Electrical Revision Reference

Static single-page revision/reference app for electrical.scriptai.space.

Purpose

This project is a UK/Northern Ireland electrical revision aid for competent-person learning and recap. It is intended for apprentices, improvers, qualified electrical workers and supervised learners who need compact notes on principles, terminology, testing purposes, documentation and Northern Ireland compliance context.

It is not a contractor website, lead-generation page, quote workflow, public DIY wiring guide or replacement for BS 7671, employer procedures, manufacturer instructions, supervision or formal training.

Files

  • index.html - the complete static app, including content, styles and vanilla JavaScript.
  • sitemap.xml - root URL only for the hash-based single-page app.
  • robots.txt - crawler policy pointing at the sitemap.

Run Locally

python3 -m http.server 8000

Then open http://127.0.0.1:8000/ from this directory.

Review Policy

Technical and legal content must be reviewed against the current edition of BS 7671, official Northern Ireland sources, employer procedures and competent electrical judgement before it is relied upon or published as reviewed.

The EICR Testing module is a competent-person learning/reference section. It includes conceptual diagrams, a filterable observations table, print checklists and Northern Ireland private-tenancy notes. It must remain educational and must not become a public live-testing or contractor lead-generation workflow.

Official source anchors:

Manual Review Checklist

A qualified/competent reviewer should check:

  • BS 7671 edition/amendment wording
  • safe isolation wording
  • inspection and testing wording
  • EICR coding notes
  • EICR Testing module anchors, accordion behaviour and observations table
  • EICR diagrams for conceptual accuracy and accessibility text
  • EICR live-testing wording for competent-person-only framing
  • EICR private-tenancy report duties, dates and remedial timing
  • consumer unit and protective device notes
  • SPD and AFDD notes
  • bathroom and special-location notes
  • EV charging, open-PEN and PME notes
  • outbuilding earthing and bonding notes
  • NI private tenancy electrical safety dates and duties
  • NI smoke, heat and carbon monoxide alarm dates and duties
  • Building Control and NI compliance wording
  • all future diagrams or concept visuals

Content Boundaries

Do not add contractor lead-generation content, fake business details, contact/quote flows, testimonials, pricing, service-area claims, emergency callout copy, insurance claims or membership claims.

Do not add terminal-level wiring instructions, consumer-unit internal wiring, meter-tail diagrams, socket/switch terminal diagrams, shower/cooker wiring diagrams, fixed cable-size recipe tables, detailed test-lead connection diagrams, buried cable installation instructions, or bathroom zone diagrams unless they have been manually checked and clearly labelled as conceptual.

EICR diagrams are allowed when they are original conceptual visuals. They must not show terminal-level wiring, exact live test-lead placement or proprietary BS 7671/GN3 tables. Any values, limits or device-specific rules must be verified against current BS 7671, current guidance and manufacturer data.

Releases

Packages

Contributors

Languages